Close Menu
    Facebook X (Twitter) Instagram
    USAHITMAN Conspiracy News
    Facebook X (Twitter) Instagram
    USAHITMAN Conspiracy News
    Home»Interesting News»FirstEnergy Says It’s Fixing a Leak at Ohio Nuclear Plant
    Interesting News

    FirstEnergy Says It’s Fixing a Leak at Ohio Nuclear Plant

    By mediahitmanJune 7, 2012Updated:June 10, 2012No Comments1 Min Read
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    Share
    Facebook Twitter LinkedIn Pinterest Email

    FirstEnergy Corp. is repairing a leak discovered June 6 as it restarted Davis-Besse nuclear station in Ohio following a refueling outage, a company spokeswoman said.

    FirstEnergy can’t say for competitive reasons when it expects to complete the repair to the reactor’s coolant system or when the 913-megawatt unit will come online, Jennifer Young, a spokeswoman for the Akron, Ohio-based company said in a telephone phone interview today.

    The amount of radioactive water that sprayed through the pinhole-sized leak was “relatively small” and no radiation was discharged from the plant, Young said.

    The leak was below the U.S. Nuclear Regulatory Commission threshold for mandatory reporting, Viktoria Mitlyng, a spokeswoman for the agency in Lisle, Illinois, said today in a telephone interview.

    Source

    FirstEnergy Fixing Leak Nuclear Power Plant Ohio
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    mediahitman

    Related Posts

    Two hundred Americans to face quarantine in California

    January 30, 2020

    Sandy Hook conspiracy theorist arrested for spreading personal info of victim’s dad

    January 28, 2020

    FBI requested interview with Prince Andrew on Jeffrey Epstein case, but received ‘zero cooperation’

    January 28, 2020
    Leave A Reply

    Facebook X (Twitter) Instagram Pinterest
    © 2026 ThemeSphere. Designed by ThemeSphere.

    Type above and press Enter to search. Press Esc to cancel.